翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Line E (Buenos Aires Metro) : ウィキペディア英語版
Line E (Buenos Aires Underground)

Line E of the Buenos Aires Underground, which runs from Plaza de los Virreyes to Bolivar (with an extension to Retiro under construction), currently extending a total distance of 9.2 km. The line was the last completely new line to be added to the Buenos Aires Underground, until 2007 when Line H was opened and has a history of being re-routed and extended due to having been historically the line with the lowest passenger numbers on the network.
==History==

Line E was opened on 20 June 1944, after construction began in 1938, with an original course that ran from Constitución railway station to General Urquiza. Soon after, it was decided to abandon the terminus at Constitución (which also served as the connection with Line C) and instead reroute the line towards the Plaza de Mayo.
Work began in 1957, and in 1966 the San José, Independencia, Belgrano and Plaza de Mayo (now Bolívar) stations were opened to the public by president Arturo Umberto Illia. For many years, the two stations closed during the re-route remained unused until the mid 1990s when one was converted into a workshop to service the rolling stock of the line.〔(Línea E: 70 años buscando pasajeros ) - EnElSubte, June 2014〕
The line was further extended in 1973 to José María Moreno and then again in 1985 to Plaza de los Virreyes.〔(Línea E ) - Buenos Aires Ciudad.〕 The PreMetro E2 tramway was completed in 1987 and was linked to Line E with the intention of connecting a larger Premetro network to the line, though this never materialised following privatisation.〔(Premetro a Puente de la Noria, en el olvido por el Metrobus del Sur ) - EnElSubte, August 2013〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Line E (Buenos Aires Underground)」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.